| Drawings, floor plans |
| About Gomos System |
| About SUMMARY |
| About Farcimar |
| Architects | SUMMARY |
| Area | 998 m² (10742 ft²) |
| Location | Cambra Valley, Portugal |
| Year | 2019 |
| Photographs | Fernando Guerra | FG + SG |
| Manufacturers | FTS - Technical Solutions, Farcimar |
| Project Team | Samuel Gonçalves, Inês Rodrigues, João Meira, Gonçalo Vaz de Carvalho |
| Building Structures And Networks | FTS - Technical Solutions |
| Electricity and Communications | Aproj |
| Pre Fabrication And Assembly | Farcimar, Precast Concrete Solutions |
After making a prototype and exhibiting at the Venice Biennale, SUMMARY presents a new project, using exclusively prefabricated and modular construction systems. The requirements of this project were clear and were defined from the first moment: the construction would have to be fast, economical and modifiable over time, depending on the different needs that could arise. The content of this order led the studio to use prefabricated elements and to leave parts of the project undefined, assuming the speed of construction, flexibility and optimization of resources as central themes.
The two programs that make up the building are positioned on two different floors: the ground floor is occupied by multifunctional service areas, in direct contact with the public road; the upper floor is intended for housing units (six 45m² rooms). An independent access is created for each of these programs, positioned at different levels, taking advantage of the natural slope of the terrain. Prefabricated structural panels perimetrically delimit and support the ground floor, which was designed to allow changing the layout and number of the interior partition walls, or simply eliminating them, transforming this whole area into a large open space.
The upper floor is entirely composed of modules from the Gomos System. Considering that the maximum area to be built legally allowed was very limited, the required empty space is used as a separator of the various housing units. Conceived and licensed as a fraction of collective housing, with these separations, this part of the project incorporates the main advantages of single-family housing: clearly individualized entrances and a complete acoustic separation between the different units.
The prefabricated reinforced concrete, predominant in the structure and composition of the building, is assumed to be visible in all its extension (inside and outside), without paintings or coatings, a fact that contributes to the reduction of costs and the environmental impact of this construction, by the suppression of additional materials and labor inherent in its application. This economy of resources and workforce also results in an accelerated construction process: the different components of the building are completed in the factory and are assembled in site in their final shape and finish, while solving structural, insulation and cladding issues.