Collection of Best Prefab Modular Homes and Buildings - Prefabium
Showing posts with label Colorado. Show all posts
Showing posts with label Colorado. Show all posts
Irontown Homes - Modular Homes Manufacturer - MT, ID, WY, NV, CO, AZ, CA, OR, UT
A premier provider of modular homes serving regions from Colorado all the way West to the Pacific, Irontown Homes is known for providing quality custom-built homes of all shapes and sizes.
Irontown Homes has been building modular homes for close to 40 years. From complete custom modern designs to traditional upscale homes, Irontown Homes takes a unique approach by building to match what each customer wants. While Irontown Homes has more than 30 home plans, each can be fully customized based on what each customer wants.
Irontown Homes focuses on building sustainable, energy-efficient homes in the Western United States and can produce single module retreats that are as small as 400 sq. ft. to multi-module homes more than 10,000 sq. ft.
Advertisement
First LEED Silver Certified Prefab Modular Home in Colorado, Denver
| Floor plans |
| Manufacturing in factory |
| On-site Assembly |
| About Tomecek Studio |
| Awards |
| LEED Certified, LEED-Home Pilot Program |
| 2008 Builder Magazine Grand Award |
| AIA Colorado Citation Award |
| AIA Colorado North Chapter Merit Award |
| AIA Colorado YAAG Built Architecture Award |
| Project | 32nd Modular |
| Architects | Tomecek Studio |
| Area | 2,750 square feet |
| Manufacturing time (80% completed in factory) | 3 weeks |
| Assembly time | 4,5 hours |
| Project completion time | 4,5 month |
| Location | Denver, Colorado |
| Year | 2007 |
When Brad Tomecek and his family outgrew their Denver loft and decided to swap it for a single-family home, the architect took the opportunity to experiment with an alternative building technique.
He purchased a narrow 25-foot-by-125-foot infill lot within walking distance to downtown, and, along with his colleagues at Studio H:T, designed a 2,750-square-foot modular house to be built in a factory. “It was an experiment to bring modern green design through the prefab process,” says Tomacek. “It saves time and reduces material waste to just 5 percent.”
The first LEED Silver–certified modular house in the state, it has a poured-in-place foundation with two boxes stacked above. “Because the site borders a commercial area, the zoning let us go a little higher than usual,” Tomacek explains. “That allowed for three stories including a basement.” Sliding the top box back a few feet created an upper southern deck and a covered rear entry area.
The project took just four-and-a-half months from start to finish. “We went from a foundation to a full frame structure in about five hours,” says Tomecek. “It was a good experience, and now we have another tool in our toolbox.”
Subscribe to:
Posts (Atom)
