5 Hours Install Time Prefab House - CasaMONTAÑA, Spain






Manufacturing Process
Plans
About architect

Architect [baragaño]
Project CasaMONTAÑA
Area 100 m2
Location Asturias, Spain
Year 2016
Manufacturing Time 4 month
Install Time 5 hours
Photos Verónica Carreño, Mariela Apollonio




[From b. Lat. Focāris, adj. Der. Of focus, fire]
Place where the fire is made. House. Group of people living together.

"The house is the coat."
- Álvaro Siza

"The house is a dwelling machine."
- Le Corbusier

English clients, in love with Asturias, decide that their second home will be industrialized. Produced during four months in a factory in Madrid and transferred to its final location at 600 km, crossing the Cantabrian mountain range, where it will assemble in only 5 hours. Finally, the black slate roof is placed by a craftsman of the zone. Technology and tradition in the days of Brexit.

The project is developed in two levels, with a simple program that groups the installations in one of the three modules of 2.15 x 5.30 m that conform it. The metal staircase is the central element of the dwelling, around which the program runs and which dialogues with the chimney suspended from the living room. The upper floor contains the two rooms, separated by a light polycarbonate wall that sifts the light.

A prefab home for an English landscaper and his family, actively developed with clients, involved in the project from the very begining outset, showing absolute respect for the rural environment where it is located. A wonderful complex formed by an "hórreo" and a traditional dwelling, in process of rehabilitation is tourist accommodation, that still keep alive the project.

New ways of conceiving housing, a high quality product, that tries to approach to the automotive and aeronautics industry, that allows a future growth of the building offers a way of using the space in a much more dynamic, versatile and rational way.

Prefab Modular System

The fact of produce our prefab homes in a factory and transporte them to the site completely finished, apart from get more control over the quality of work, means several advantages which are listed below.

1. Costs and lead time reduction and therefore faster benefits [4 months].

2. Higher security at work and reduction of potential working risks.

3. High quality construction, meeting the requirements of the CTE and energy Efficiency.

4. Different materials option. Adaptable and exportable housing [Growing Houses].

5. Option of relocate the house in other place [Mobility].

6. Real sustainability from the way of building and used materials. Optimization and Recycling.

7. Noise, discomfort and waste reduction. The main work is done at the factory.

8. Project, design, manufacture and assembly of the prefab house.

9. Structural Safety and precision, overall in earthquake zones.

10. Accessible Housing and elevator option.

The system used for the housing construction is a modular three-dimensional components system manufactured in assembly. The main structure is composed of galvanized steel sheet elements with rigid joints solved by welding, fulfilling all requirements set by the CTE.

The modular construction system manufacturing assembly line not only seeks to optimize energy resources, human and material, but also to optimize in benefit of customization and adaptation of the building.















Manufacturing Process






Plans






















About [baragaño]





b is the second letter in the abc and the first consonant. Comes from the word bayib, that was taked from the pictogram of a house in egipcians hieroglyph.
b is the greek beta and the latin b.
In English b /bi:/ means to be
/bi:/ shows ambiguity too, the ones that separate and links at the same time the architecture with other disciplines, cinema. Literature, art, photography, fashion, etc… In the limits, around architecture…
bi is beauty in Japanese.

b from baragaño, surname of the director and founder of [baragaño]. An architectural office created between two seas and one no-sea. Mediterranean, Cantabric, and Madrid…where is placed today, dreaming the sea…

Address [baragaño], Serrano 5, Madrid, Spain
Phone +34 91 57 81 945; +34 618 507 010
Email b@barchitects.eu
Website http://www.barchitects.eu